If you are planning to export wireless products to Indonesia, you may already have test reports from previous certification projects. But can these reports be used for DJID Type Approval, or will you need to test your product again in Indonesia?

The answer depends on the laboratory that conducted the testing and whether its reports meet Indonesia's regulatory requirements.

Manufacturers can follow one of two certification routes: the Paperwork Route, which allows eligible existing test reports to be used, or the Local Testing Route, which requires testing at an Indonesian laboratory.


1. Can Your Existing Test Reports Be Accepted?

Before applying for DJID Certification, check whether your existing test reports qualify for the Paperwork Route.

Indonesia accepts eligible overseas test reports from laboratories recognised under its applicable MRA and foreign laboratory recognition arrangements. However, acceptance is not automatic. The laboratory must meet Indonesia's recognition requirements, and its approved testing scope must cover the applicable product requirements.

Before submitting your reports, check the following:

  • Laboratory Recognition: Is the laboratory recognised under the applicable Indonesian MRA or foreign laboratory recognition arrangements?

  • Accreditation: Does it hold the required accreditation for the relevant testing activities?

  • Testing Scope: Does its recognised scope cover the required RF, EMC and safety parameters?

  • Product Model: Do the reports identify the same product model being submitted for DJID Type Approval?

  • Testing Requirements: Do the reports cover the applicable Indonesian technical standards?

Having an internationally accredited test report alone does not guarantee acceptance. The laboratory's recognition status and testing scope must also meet the applicable Indonesian requirements.

If these conditions are met, eligible reports may be accepted under the Paperwork Route without repeating the covered tests in Indonesia.


2. What Happens If Your Test Reports Are Not Accepted?

If your existing reports are not eligible, you will need to follow the Local Testing Route.

Under this route, the required testing must be completed at an Indonesian laboratory recognised for the applicable testing activities.

Manufacturers must generally arrange two product samples, where applicable, for the local testing process. Depending on the equipment, assessments may include RF, EMC and safety testing.

The samples must be sent to the approved Indonesian laboratory before testing can begin.

This is why reviewing existing reports before applying is important. It helps manufacturers determine whether they can use the Paperwork Route or need to arrange additional local testing.


3. Is Local SAR Testing Required for DJID Certification?

Indonesia has a specific local testing requirement for SAR. If your product requires SAR testing, it must be conducted at an Indonesian laboratory, even if you qualify for the Paperwork Route for other testing parameters.

Overseas SAR reports are not accepted under the applicable certification process.

Manufacturers should therefore consider local SAR testing when planning their product samples and certification schedule.


4. How Long Does DJID Certification Take?

The typical lead time for Indonesia DJID Type Approval is approximately 10–14 weeks.

However, the actual timeline may vary depending on:

  • Acceptance of existing test reports.

  • Additional local testing requirements.

  • SAR testing, where applicable.

  • Product sample availability.

  • Documentation and application processing.

Reviewing your test reports early can help identify additional testing requirements and avoid unexpected delays before shipment.


How Nano Technology Solutions Can Help

Nano Technology Solutions supports manufacturers with Indonesia DJID Type Approval through:

  • Reviewing existing test reports and laboratory eligibility.

  • Identifying applicable RF, EMC, safety and SAR requirements.

  • Assessing eligibility for the Paperwork Route.

  • Coordinating local laboratory testing, including SAR testing where required.

  • Arranging a qualified Indonesian local representative.

  • Preparing and submitting certification documents.

  • Managing application follow-ups through to certificate issuance.


Key Takeaways

  • Existing test reports: Review their eligibility before applying.

  • Local testing: Plan for additional testing if required.

  • SAR testing: Arrange testing at an Indonesian laboratory whenever applicable.

  • Certification planning: Check requirements early to avoid unnecessary costs and delays


Existing Test Report Assessment

Check Existing Test Reports

↓

Check if DJID Accepts the Reports

↓

Are the Reports Accepted?

┌────┴────┐

↓ ↓

YES NO

↓ ↓

Paperwork Local Testing

Route Route

└────┬────┘

↓

Check SAR Testing Requirement

↓

Local SAR Testing (if required)

↓

Proceed with DJID Approval


Need assistance with Indonesia DJID Type Approval? Contact Nano Technology Solutions at info@nanotechsol.com.

Comments


bottom of page